| 1. | Quality control of steel skeleton concrete casting 钢骨高强混凝土柱受力性能的试验研究 |
| 2. | Construction site supervision of quality control in the concrete casting 混凝土浇筑质量控制的旁站监理 |
| 3. | Precast concrete casting yard 预制混凝土浇灌场 |
| 4. | Construction quality control measures of post - grouting reinforced concrete casting pile 后压浆钢筋混凝土灌注桩施工质量保证措施 |
| 5. | Cause and prevention of cracks on reinforced concrete cast plate of residence apartments 住宅楼钢筋混凝土现浇板裂缝的原因和防治 |
| 6. | Analyze the reinforced concrete cast - in - situ slab how to produce the cracks and hou to control 浅谈钢筋混凝土现浇板产生裂缝的原因及控制 |
| 7. | The reasons and treatment measure for model swelling in pile concrete casting of slope suppoting 高边坡支护抗滑桩混凝土浇注中涨模的原因及防治措施 |
| 8. | Prior to concrete casting , upper column rebar and anchor bolt thread shall be wrapped by plastic sheet to prevent contamination from concrete 2砼浇筑前用塑料薄膜对上部柱筋及螺栓丝扣进行保护,防止砼污染钢筋。 |
| 9. | Beginning concrete casting of main building foundation on dec . 15 . 1994 , signifying the official commencement of yahekou power plant phase i project 3 1994年12月15日,主厂房基础开始浇灌,标志着鸭河口电厂一期工程正式开工。 |
| 10. | Commercial concrete and concrete truck and pump truck will be used for this construction . concrete casting route and pump truck allocation will be according to the site conditions 1本工程砼均采用商品砼,砼罐车运输,泵车浇筑。浇筑路线及泵车就位布置根据现场具体情况确定。 |